Most homeowners pay $1,300 to $3,000 to replace an electrical panel, and $2,500 to $5,000 for a full service upgrade from 100 to 200 amps that also replaces the meter base and the service entrance cable. The low end is a straight swap in an easy-to-reach spot. The high end includes utility work, a relocated panel, or code fixes the inspector requires.
The number that matters most is which of two jobs you need. Replacing the panel at the same amperage is mostly a box-and-breakers job. Upgrading the service means everything from the utility connection to the panel gets bigger, and the utility has to be involved.
Panel upgrade cost by amperage
| Job | Typical installed cost | What’s included |
|---|---|---|
| Same-amp panel replacement | $1,200–$3,000 | New panel and breakers, existing service stays |
| Upgrade to 100 amps | $800–$1,800 | Usually older homes coming off fuses |
| Upgrade to 150 amps | $1,500–$2,800 | Smaller homes with gas heat and cooking |
| Upgrade to 200 amps (panel only) | $1,300–$3,500 | Panel and main breaker; meter and service cable reused |
| Full 200-amp service upgrade | $2,500–$5,000 | Panel, meter base, service entrance cable, grounding, permit |
| 300–400 amp service | $4,000–$10,000+ | Large or all-electric homes; often two panels |
A 200-amp panel is the standard for a modern single-family home. If your house runs on 100 amps and you’re adding central air, a heat pump, an EV charger or an induction range, 200 amps is usually where you end up.
Where the money goes
| Line item | Typical cost |
|---|---|
| 200-amp panel (box only) | $250–$400 |
| Breakers (standard, AFCI, GFCI) | $200–$1,000+ |
| Meter base and service entrance cable | $300–$1,000 |
| Grounding (rods, bonding, clamps) | $100–$300 |
| Electrician labor | $600–$2,000 |
| Permit and inspection | $50–$600 |
| Utility disconnect and reconnect | $0–$500+ |
Breakers are the line item people underestimate. Current code calls for AFCI or combination AFCI/GFCI protection on most living-space circuits, and those breakers cost $40 to $70 each compared with under $20 for a standard one. A 30-circuit panel can add several hundred dollars in breakers alone.
What pushes the price up
- Moving the panel. Panels in closets, bathrooms or tight spaces often don’t meet today’s clearance rules. Relocating one means extending every circuit, which can add $500 to $2,000.
- Overhead vs. underground service. An overhead drop may need a new mast and weatherhead. An underground lateral sized for 100 amps may need trenching and new conductors.
- Old or recalled panels. Federal Pacific (Stab-Lok) and Zinsco panels are known for breakers that don’t trip. Insurers often push for replacement, and the old wiring behind them can need work too. See fuse box vs. circuit breaker if you’re still on fuses.
- Grounding and bonding fixes. Older homes often lack proper ground rods or water-pipe bonding, and the inspector will flag it.
- Drywall and finish work. Most electricians don’t patch walls. Budget separately if the panel is in a finished room.
- Local labor rates. Coastal metros and the Northeast can run 30 to 50 percent above national averages.
Do you need a panel upgrade at all?
Not every capacity problem needs a bigger service. Depending on what you’re adding, there are cheaper routes:
- Out of breaker slots, but not out of power: a subpanel ($500 to $1,750) adds space without touching the service.
- Adding one big load like an EV charger: a load calculation may show your 100- or 150-amp service has room. Smart chargers and load-management devices can also cap draw so the panel never overloads. See EV charger installation.
- Breakers trip, lights dim, panel is warm or buzzing, or you see scorch marks: those are safety signs, not capacity questions. Have it inspected soon. The signs your panel needs replacing guide covers the full list.
A licensed electrician should run a load calculation (NEC Article 220) before quoting a service upgrade. If a quote jumps straight to 200 or 400 amps without one, ask for it.
Ask each electrician to include the load calculation, the panel brand and model, the breaker types and the permit in the written quote. That’s the easiest way to compare bids that look $1,500 apart but cover different work.
How the job goes
- Assessment and quote. The electrician checks the existing service, runs the load calc and confirms whether the utility needs to be involved.
- Permit and utility scheduling. For a service upgrade, the utility has to schedule a disconnect. This is often the longest wait, anywhere from a few days to several weeks.
- Install day. Power is off for most of the day. The old panel comes out, the new one goes in, and each circuit is landed on a new breaker and labeled.
- Inspection and reconnect. The local inspector signs off, then the utility reconnects and, if needed, installs a new meter.
For how the main breaker, bus bars and branch circuits fit together, see how the main electrical panel works.
Rebates and tax credits
The federal 25C credit that covered panel upgrades tied to heat pumps and other efficient equipment ended for work completed after December 31, 2025. Some states and utilities still offer panel or electrification rebates, especially when the upgrade supports a heat pump or EV charger. Check your utility’s rebate page and your state energy office before you sign.
Is it worth it?
A 200-amp panel won’t raise your home’s value on its own the way a kitchen does, but an undersized or recalled panel can stall a sale or trigger an insurance problem. If you’re planning a heat pump, an EV, an addition or a kitchen remodel, doing the panel first usually costs less than paying for workarounds later. More on that in electrical improvements that increase home value.
Sources: This Old House, HomeAdvisor and Angi panel upgrade cost guides; Fixr; Inch Calculator; National Electrical Code (NFPA 70) Article 220; IRS guidance on the 25C Energy Efficient Home Improvement Credit.